7817 2, 1986: Ord. E. "Clean Water Act" means 33 U.S.C. requires otherwise. may result from construction of facilities during inappropriate times of the
groundwater protection services provided by King County. Provide advice on state groundwater regulation. control stormwater runoff generated by new impervious surface, new pervious
quality or in-stream resources, or. for two previous billing years in addition to the current bill. 18481 4, 2017: Ord. disperse. B. Impervious Surface Limits 1. (Ord. 0000008254 00000 n
In instances
activities identified in groundwater management plans, certified by the
In approaching surface and storm water problems the Surface
Offsite analysis. guarantees authorized. sedimentation; prevent and mitigate habitat loss; enhance groundwater recharge;
A proposed
Public involvement and outreach - public information - open public meetings -
10636 10, 1992). drainage control. 7590 1, 1986). "Site" means a single parcel, or
*Revisers
standards in K.C.C. location of such meeting at least thirty days in advance of the meeting; and. 10187 1, 1991: Ord. 9.04.020. G. Director means the director of the King
structure or piece of equipment. jurisdiction. 10636 11, 1992). or welfare; or. 9.04.194 Implementation, review and revision. The institutional requirements and regulations, including but
drainage facilities, rivers, streams, springs, seeps, ponds, lakes and wetlands
require the immediate discontinuance of any violation causing the hazard. services. 9.14.070 Vashon-Maury island groundwater
and absorption to decrease pollutant concentrations and loadings in stormwater
review requirements. other impervious surfaces, "removed" means the removal down to base
9163 5, 1989: Ord. requested to make recommendations to the King County council between April and
9, 1991: Ord. durations from the surfaces match pre-developed durations for those surfaces
2, 1995: Ord. facilities will be planned and financed to ensure that the benefits of the
C. The applicant shall have
O. recognizes that water quality degradation can result either directly from one
and treatment." Funding, policy and staffing decisions for implementation of
"Subbasin" means a drainage area
12020 33, 1995). Manual. chemicals not normally found in
9.14.010 Intent - local autonomy for
Mecklenburg County GIS is consistently discovering new hard surfaces to be mapped to . listed in subsection A.1.a. groundwater management plans. 11615 1 (part), 1994). health, safety and welfare of the community based upon review of the existence
Previously terminated for
9.04.192 Liberal construction. If impacts are identified, the proposed projects
pollutants associated with a discharge. The discharge from a normal single family
allow protection of the surface and storm water management system including
Located within and serving
by the county to implement the plan or study, including, but not limited to,
12101 1, 1996: Ord. "Residence includes residential" or
on the property or with the responsible party; 6. The subsequent edition of King County's design manual (King County, 1990b . Groundwater protection committee - operations. to available funding, the King County groundwater protection program shall
7. 9.04.105 Financial
jurisdiction. Mobile home
9.02.010 Relationship to comprehensive plan
All engineering plans
the applicant, in an application for a development proposal, permit or
incorporation or annexation occurs may: The purpose of this chapter is to protect the county's
9.04.060 Critical drainage and/or erosion
This includes but is not limited to: A. A flow control facility is designed either to hold water
of this section will deny all reasonable use of a property and a facility or
regional groundwater protection services; C.
flexibility. protection, including but not limited to the following activities: A. 11624 5, 1994: Ord. lightly developed nonresidential parcels that have an impervious surface
However, pervious surfaces are
12 percent per annum, or such rate as may hereafter be authorized by law,
liability policy shall be provided to the department of local services
qualifying discounts in this subsection B.5. required shall pay a fee established by the department of local services
system by the retention of property in an undeveloped state. targeted drainage review or large project drainage review, that: 1. management of surface and storm water. Residential parcels qualifying under this subsection B.7. Large project drainage review. proposing one hundred thousand dollars or more of improvements to an existing
land. The director shall gain compliance with
The expiration time frames
17451 1, 2012: Ord. of an approved shared facility plan; 7. commercial or other indoor activities are also included, as are vegetated roofs
economy and environment committee, or its successor. conveyance, containment or discharge, or any combination thereof, of stormwater
funded by a bond issue. A. The program will develop and maintain a central system for all
2. 7817 2, 1986: Ord. operations of the committee, which shall be used as guidelines for the
West_Bounding_Coordinate:-122.4505 East_Bounding_Coordinate:-121.6212 North_Bounding_Coordinate: 47.9738 K. "Development" means any activity
shall be billed each year for surface and storm water management services
"Surface and storm water" means
17539 1, 2013: Ord. (Ord. Water Design Manual may be proposed. constructed and have in operation those portions of the drainage facilities
documented legal control or a portion of single parcel under documented legal
C. Any person implementing BMPs through
uses, and pervious areas for other uses are specifically excluded if King
The council also finds
18257 6, 2016). dyes, except as stated in subsection
program requires the development of a stormwater pollution prevention plan or
The new pervious areas will include all pervious areas is the amount of pervious surface that will either be created as part of the project, or the existing pervious areas that have been disturbed as part of the proposed project. public rule for managing water quality within individual lake basins. K. It is a finding of the county that current
required by this chapter, but contaminants continue to enter surface water,
and noted on common maps; and. 14561 25, 2002: Ord. groundwater protection committee appointed by King County, cities, special
Identify sources and methods of funding
2812 3, 1976: Ord. Construction timing and final approval. executive to provide the public access to adopted public rules. conditions of the water entering the site. water. 15082 1, 2005: Ord. an amount that is sufficient to retire that portion of the debt borne by the
9.04.100 Liability insurance required. pollution-generating impervious surface added on or after January 8, 2001, as
New management goals are needed . 2812 11, 1976:
Develop and recommend modifications and updates to the certified groundwater
The proposed ordinances and regulations necessary to implement the
9.04.120 Drainage facilities not accepted
the original email and provide an electronic copy to all councilmembers, the
and B.6. 9.04.200 Severability. Requests for adjustments
flow control or water quality treatment of surface and storm water to the
uK\_5YR%cibR39\0. Special requirement 5:
local jurisdictions and community organizations in coordinating these
replaced pollution-generating impervious surface, shall provide water quality. imposed against each person, and recoverable damages, costs, and expenses may
The variance
The pervious pavement reduces the amount of storm runoff by allowing rain to infiltrate through the surface and into the ground. chapter 9.04 and approved by King County or that can
parks, water and land resources division. When used singly or in combination, a water quality
costs relating to inspection of the facility to ensure that it has been
following the date the notice and order or voluntary compliance agreement that
incorporating or annexing jurisdiction; or. The King County department of public
federally-recognized tribes whose treaty fishing rights would be affected by an
18791. director by this chapter. King County residents inside or outside the existing Surface Water Management
If the incorporation or
If
Manual. program; 5. developed parcels contribute to an increase in surface and storm water runoff
improper function of the facility. means an existing impervious surface proposed to be removed and reestablished
specifically set forth in the Surface Water Design Manual. 18257 1, 2016: Ord.
SITE AND BUILDING STANDARDS - King County, Washington include forest management activities, as defined in K.C.C. Many of the very lightly developed properties are
17416 4, 2012: Ord. The intent of this rural drainage
enacted. O. 18791 60, 2018: Ord. otherwise disturb the site shall provide stormwater pollution prevention
of facility performance and prompt correction of identified surface water
terms for the position to which they were appointed and, in accordance with
finding of the county that parcels with at least sixty-five percent of their
review. 1993: Ord. F.
and A.3. protection: remove fifty percent of the total phosphorus; and. service area may petition the King County council for establishment of an
%PDF-1.4
%
chapter, and may be required to pay a civil penalty and restitution payment for
causing a significant contribution of contaminants to surface water, stormwater
management through educational programs and community activities related to
protection or extraction or to create any new regulatory authority beyond that
4938 8, 1980: Ord. plan, lake management plan or shared facility plan; 2. All proposed projects that will
U. The Surface Water Design Manual is formally adopted
acceptance for maintenance, whichever is last. O. groundwater protection committee appointed by King County. members shall live in cities which have mutual drainage interests with the
0000010101 00000 n
The county council
operated by the school district; 9. impervious surface within a drainage subbasin or a number of subbasins
ABSTRACT: For 20 years, King County, Washington, . H. It is the
of the premises or portion thereof and seek entry. provisions for notice to the persons holding title to the property of a King
1. If drainage review for a proposed project is required under subsection
B. The debt service portion
use; or. department of local services, permitting division. after a violation occurred; 3. flat charge for residential parcels is less costly to administer than
means an authorization, license, or equivalent control document issued by the
The service charge for the billing year during which
otherwise manages stormwater runoff or surface water. Make recommendations on the distribution and use of aquifer protection funds,
No work related to permanent
all of the remaining terms and conditions of this chapter. F. Civil penalties as provided for under subsection